Views: 0 Author: Site Editor Publish Time: 2020-05-22 Origin: Site
This is the Australian villa exported by our company, and we are making shipment arrangement.
1.Before delivery, the staff is pre-assembling the villa to check whether there are any problems with the installation, so as to reduce the installation problems caused by the export.
2. Disassemble the villa after pre-assembly, and then bundled and packed reasonably according to the size of the container, and kept tidy.
3. Ready for loading. Forklift, crane and other tools are ready.
4. The crane lifts the steel structure, and the forklift truck assists to send the steel structure package into the container.
5. Containers are packed and shipped to the port. Delivery is completed at the factory.