Project Name: | Single-storey Steel Structure Workshop |
Area: | 2980㎡ |
Main Structure: | welded H beams |
OEM: | Support |
Welding Method: | Auto Aubmerger Arc Welding |
Connection Method: | Bolt and welding connection |
Roof systems: | 0.5mm thick blue color steel plate |
Wall systems: | 0.5mm thick white color steel plate |
Transport Package: | bundles |
Delivery time: | 35days |
Project introduction:
The project is a single-storey steel structure workshop, with a total of 2980 square meters. The project mainly consists of steel structure frame, blue color steel plate roof and wall panel enclosure. Beams and columns are hot rolled H beams, purlins are cold-formed thin C section beams;
Structure
All prefabricated building, built using modules or panels, are then installed onsite.
Assembly
Once construction has been completed in the factory, the prefab building is then transported with the base on which it was assembled.
This construction method, with its innovations, ensures that your new prefab building will be comfortable, energy efficient, and will stand the test of time.
1.Enviromental friendly
2. Lower cost and maintenance
3. Long using time up to 50 years
4. Stable and earthquake resistance up to 9 grade
5. Fast construction, time saving and labor saving
6. Good appearance
Our Service
We would offer you the most valuable quotation,if you provide us with the following information.
1) Dimension: Length, width, height, eave height, roof pitch, etc.
2) Doors and windows: Dimension, quantity, position to put them.
3) Local climate: Wind speed, snow load, etc.
4) Insulation material: Sandwich panel or steel sheet.
5) Crane beam: Do you need crane beam inside the steel structure? And its capacity.
6) If other requirements, such as fire proofing, isolated roof, etc, please kindly inform us.
Basic Info.
Project Name: | Single-storey Steel Structure Workshop |
Area: | 2980㎡ |
Main Structure: | welded H beams |
OEM: | Support |
Welding Method: | Auto Aubmerger Arc Welding |
Connection Method: | Bolt and welding connection |
Roof systems: | 0.5mm thick blue color steel plate |
Wall systems: | 0.5mm thick white color steel plate |
Transport Package: | bundles |
Delivery time: | 35days |
Project introduction:
The project is a single-storey steel structure workshop, with a total of 2980 square meters. The project mainly consists of steel structure frame, blue color steel plate roof and wall panel enclosure. Beams and columns are hot rolled H beams, purlins are cold-formed thin C section beams;
Structure
All prefabricated building, built using modules or panels, are then installed onsite.
Assembly
Once construction has been completed in the factory, the prefab building is then transported with the base on which it was assembled.
This construction method, with its innovations, ensures that your new prefab building will be comfortable, energy efficient, and will stand the test of time.
1.Enviromental friendly
2. Lower cost and maintenance
3. Long using time up to 50 years
4. Stable and earthquake resistance up to 9 grade
5. Fast construction, time saving and labor saving
6. Good appearance
Our Service
We would offer you the most valuable quotation,if you provide us with the following information.
1) Dimension: Length, width, height, eave height, roof pitch, etc.
2) Doors and windows: Dimension, quantity, position to put them.
3) Local climate: Wind speed, snow load, etc.
4) Insulation material: Sandwich panel or steel sheet.
5) Crane beam: Do you need crane beam inside the steel structure? And its capacity.
6) If other requirements, such as fire proofing, isolated roof, etc, please kindly inform us.
content is empty!