Availability: | |
---|---|
Quantity: | |
Basic Info.
Project Name: | Plant steel structure in Gabon |
Area: | 3808 ㎡ |
Main Structure: | welded H-beam,C-beam |
OEM: | Support |
Welding Method: | Auto Aubmerger Arc Welding |
Connection Method: | Bolt connection,bearing |
Roof systems: | color steel sheet |
Wall systems: | color steel sheet |
Transport Package: | bundles |
Delivery time: | 50days |
Project introduction:
This is a steel workshop building built in Gabon, Africa. It uses welded H-beam, C-beam purlin; Auxiliary members are round steel, Angle steel, channel steel and so on. The wall enclosure part adopts 0.5mm thick color steel plate; Paint is epoxy zinc rich primer and intermediate paint.
Advantages of the steel structure for workshop
Light weight, industrialized manufcture, convenient for shipment and transportation
High strength, wide span
corrosion resistance, heat-insulation
Highly secure and reliable.
fast installation, shorter construction time
Easy and fast to build, low cost
Basic Info.
Project Name: | Plant steel structure in Gabon |
Area: | 3808 ㎡ |
Main Structure: | welded H-beam,C-beam |
OEM: | Support |
Welding Method: | Auto Aubmerger Arc Welding |
Connection Method: | Bolt connection,bearing |
Roof systems: | color steel sheet |
Wall systems: | color steel sheet |
Transport Package: | bundles |
Delivery time: | 50days |
Project introduction:
This is a steel workshop building built in Gabon, Africa. It uses welded H-beam, C-beam purlin; Auxiliary members are round steel, Angle steel, channel steel and so on. The wall enclosure part adopts 0.5mm thick color steel plate; Paint is epoxy zinc rich primer and intermediate paint.
Advantages of the steel structure for workshop
Light weight, industrialized manufcture, convenient for shipment and transportation
High strength, wide span
corrosion resistance, heat-insulation
Highly secure and reliable.
fast installation, shorter construction time
Easy and fast to build, low cost