Basic Info.
Project Name: | Steel workshop Structure |
Area: | 3500 ㎡ |
Main Structure: | welded H beams |
OEM: | Support |
Welding Method: | Auto Aubmerger Arc Welding |
Connection Method: | welding connection |
Roof systems: | 0.5mm thick Color steel plate |
Wall systems: | 0.5mm thick Color steel plate+thermal insulation foam + aluminum foil |
Transport Package: | bundles |
Delivery time: | 35days |
Project introduction:
The project is a steel workshop structure for the production of medical devices . The project mainly consists of steel structure frame, color steel plate roof and wall panel enclosure. Auxiliary components are round steel, Angle steel, welded pipes and so on.
Steel structure building advantage :
1) Prefabricated and customized design
2) Short finishing time and low cost
3) Convenient to assemble or disassemble, time-saving, and Labor saving
4) Flexible layout, beautiful appearances, and higher space efficiency
5) Large span for great strength with light deadweight
Our service
Different kinds of professional team such as engineer team, production team, quality inspection team and installation
team etc. guarantee to meet your requirements.
Free for AAC panel sample to dispel your misgivings
All-the-way tracking for our products till you finish the installation.Long time warranty for insurance
Professional installation team including engineers will assist client to finish the whole project in your country, or we will
supply full service for installation