Main Components | Base | Cement and steel foundation bolts |
Main frame | H beam | |
Steel material | Structural steel Q235B, Q355B or others as buyers' requests. | |
Purlin | C or Z purlin: Size from C120~C320, Z100~Z20 | |
Bracing | X-type or other type bracing made from angle, round pipe | |
Bolt | Plain bolt and High-strength bolt | |
Roof & wall | Sandwich panel or color corrugated steel sheet | |
Door | Sliding door,roll-up shutter door or walk door | |
Window | Aluminium alloy window | |
Sheet | 0.5mm or 0.6mm galvanized sheet | |
Surface | Two lays of Anti-rust Painting or Hot Dip Galvanized | |
Accessories | Semi-transparent skylight belts, Ventilators,down pipe, Glavanized gutter, etc |
Product features
1. Short construction period: Compared with the traditional concrete structure, the construction period for warehouse building is about 1/3 shorter than the traditional concrete structure
2. Improve investment efficiency: Short construction period can reduce the pressure of capital occupation, reduce the risk of market change, and improve the investment efficiency of warehouse building.
3. Reduce foundation cost: The requirement of warehouse building on foundation load is reduced, which can greatly reduce foundation cost and civil foundation cost.
content is empty!