Basic Info.
Project Name: | Steel Structure warehouse building |
Area: | 5050㎡ |
Main Structure: | welded H beams |
OEM: | Support |
Welding Method: | Auto Aubmerger Arc Welding |
Connection Method: | Bolt connection |
Roof systems: | 0.5mm red color steel plate |
Wall systems: | 0.5mm green color steel plate |
Transport Package: | bundles |
Delivery time: | 45days |
Steel structure building is formed by the main framework through linking up the H beam, C purline, Z purline steel components. Roof and wall using a variety of panels together with other components such as windows and doors. The steel building has the advantages of wide span, high strength, light weight, low cost, temperature protection, save energy, beautiful appearance, short construction time, good effect of insulation, long using life, space-efficient, good seismic performance, flexible layout, etc.
Product advantage
1. Lower cost but beautiful outlook.
2. High safety performance.
3. easy to assemble and dismantle
4. manufacture under complete quality control system---ISO9001
5. installation with instruction of experienced engineers
6. Non-pollution.
1) Quotation send to you according to your drawing.
2) Engineer with rich experience design drawing according to client's requirement.
3) We offer whole building for client, such as design, manufacture, and installation.
*Pre-sale service
1. Customized drawing designing free of charge
2. Professional advice according the site conditions
3. Settle transportation affair
*Construction stage
1. Supply you with detailed construction drawing to guide
2. Send one engineer to your local
3. Provide related production for your reference
*After-sale service
1. Reasonable advice for usage, maintenance, technically improve
2. Unique engineer be in charge of your project
3. On-site service
content is empty!