Steel structure is widely used in the construction site as temporary office, factory, warehouse, city office, civil resettlement,4S stores and other temporary buildings,etc.when you build a steel structure building, there are a lot of chooices for the type and apperance ,
For structure frame: you can make the building high and low span, lean to building, H section frame or tube frame ,hanrail, fence etc For the building coverage: you can choose brick wall height, single steel sheet, sandwich panel, skylight belt, ventilation fitting, out gutter, inner gutter, dow spout etc For the window and door: you can choose sliding door , electricity roller shutter door, swing door, exist, sliding window, swing window,top-hung window,vent etc
1.What's your delivery time? | |||||||||||
Salesman will confirm the time for you, large order should communicate in advance. Normally, delivery time is 30-45days after receive deposit. | |||||||||||
2. What will the client provide before factory offers a good quotation? | |||||||||||
When we receive an inquiry from a client, client please fills the purchasing intention sheet, providing us with information of house dimensions, draft drawing, layout and materials for the prefabricated house. We will design the drawings and offer a competitive quotation with the above information. | |||||||||||
3. What are you main products? | |||||||||||
Our main products have steel structure plant, warehouse, logistic center, stadium, hangar, steel-structure supermarket, high-rise steel Construction and construction materials. | |||||||||||
4. What kind of drawing will you provide? | |||||||||||
Plan drawing, elevation drawing, sectional drawing, foundation drawing, installation drawing. | |||||||||||
5. Do you accept container loading inspection? | |||||||||||
You are welcome to send an inspector, not only for the container loading but any time during the production time. |
content is empty!